Projects & case studies

How the scope is actually structured

The examples below show the shape of a typical Vectorwatt engagement: what was engineered, what was sourced, how it was executed and what was handed over. They are illustrative samples, written to be useful — not client references.

These are illustrative examples. Every project on this page is a representative sample of a scope type, not a record of work performed for a named client. No customer names, contract values, dates or performance claims are stated or implied. Where we can share an actual reference for a comparable scope, we will do so directly during a commercial discussion.

  • Substation apparatus during an augmentation outage
    ManufacturingSample scope

    Distribution Substation Augmentation

    Illustrative example: capacity augmentation of a plant receiving substation, covering transformer replacement, HT panel modification, protection re-coordination and phased changeover inside two weekend shutdowns.

    Scope

    Transformer, HT panel, protection

    How it was handled

    • Coordinated single-vendor scope
    • Shutdown-window execution plan
    • Documented test and handover records
  • Motor control centre wiring and control gear detail
    Process IndustrySample scope

    MCC & APFC Package for a Process Line

    Illustrative example: motor control centre, APFC and drive panels engineered from a motor list of 140 feeders, with harmonic mitigation and PLC interface defined before fabrication release.

    Scope

    MCC, APFC, VFD panels

    How it was handled

    • Motor list to feeder schedule engineering
    • Detuned reactor based compensation
    • Loop checks with process handover
  • Conductor and termination detail on a high-current run
    Commercial Real EstateSample scope

    Busduct Riser for a Commercial Campus

    Illustrative example: transformer-to-panel and riser busduct routing for a multi-tower campus, with 3D routing drawings, support design and torque-audited installation.

    Scope

    Busduct, LT panels

    How it was handled

    • Route survey and clash review
    • Documented joint torque records
    • Thermography at first load
  • Protective devices checked during an emergency changeover
    UtilitiesSample scope

    Emergency Transformer Replacement

    Illustrative example: failed distribution transformer replaced through expedited sourcing, temporary arrangement during manufacturing, then erection, oil filtration, testing and charging.

    Scope

    Emergency supply, erection, testing

    How it was handled

    • Rapid technical identification
    • Temporary supply continuity
    • Full pre-charging test pack
  • Solar array feeding an evacuation substation
    Renewable EnergySample scope

    Renewable Evacuation Balance-of-Plant

    Illustrative example: balance-of-plant electrical package for a solar plant evacuation scheme, including inverter-duty transformers, collector cabling, jointing and switchyard apparatus.

    Scope

    Inverter duty transformers, cabling, switchyard

    How it was handled

    • Evacuation scheme equipment review
    • HV testing and metering
    • Utility inspection documentation
  • Sensitive electronic load in a controlled environment
    Precision ManufacturingSample scope

    Power Quality Remediation

    Illustrative example: measurement-led remediation of harmonic distortion and voltage dips affecting CNC and inspection equipment, resolved with active filtering and revised backup autonomy.

    Scope

    Measurement, filters, UPS

    How it was handled

    • Two-week measurement campaign
    • Sized active harmonic filtering
    • Post-implementation verification

What these examples have in common

The pattern behind every scope

Different equipment, different sectors, same discipline.

  1. 01

    The requirement is interrogated first

    Ratings, constraints and interfaces are established before anything is priced.

  2. 02

    Sourcing follows the reviewed specification

    Enquiries go out against what the engineering concluded, not against the original wording.

  3. 03

    Execution is planned around the site

    Shutdown windows, access, sequencing and civil readiness shape the delivery plan.

  4. 04

    Handover is documented

    Test records, as-builts and torque or filtration reports are part of the deliverable.

Request a quote

Have a scope that looks like one of these?

Send the drawing, BOQ or a description of the outcome you need. We will come back with the engineering questions first, then a structured quotation.